Type of building: Office and commercial building
Installed power (CA and HP): Cooling power 3×224kW and 1×125kW
Building surface in m2: 7234m3
Number of devices (controllers): 50
Location: Central Slovenia
Execution date: 2020
Activity description:
Discharge of glycol mixture (3,000l) from existing cooling devices, dismantling of pipes and devices, and disposal at a landfill. Installing new cooling devices, installation and connections. Filling the system with glycol mixture, pipe insulation, electrical connection of new pumps. Finally, the commissioning of the devices, test run, and training of the maintenance staff took place. All work was completed in only 3 weeks.